NRO Investigation: Inspection of Program-S, May 5, 2015

Background

Abstract from the report:

At the request of Director, National Reconnaissance Office (NRO), the NRO Office of Inspector General (OIG) conducted an Inspection of Program-S. The final inspection report is attached. This report contains no formal recommendations. However, the OIG provided a draft report to key stakeholders for technical accuracy review prior to final issuance, and the [ REDACTEDREDACTEDREDACTEDREDACTEDREDACTEDREDACTEDREDACTED ] requested an opportunity to provide management comments. Management comments are included in Appendix A of this report.

The below is the declassified OIG report, but sadly, not much can be deduced on what PROJECT-S actually is. I have filed additional requests to see what may exist.

Continue scrolling for more...

Declassified Document

 NRO Investigation: Inspection of Program-S, Closed 5/5/15 [25 Pages, 2.4MB]

 

https://documents.theblackvault.com/documents/nro/F-2016-00093.pdf

Follow The Black Vault on Social Media:

This post was published on January 4, 2017 5:20 pm

John Greenewald

Recent Posts

Marauder System’s Role in UAP Reporting and Military Operations

The Black Vault has uncovered information about the Air Force’s Marauder system through a recent…

June 27, 2024

CARNIVORE (DCS1000): FBI Files on Their Email and Electronic Communication Monitoring Software

In the late 1990s and early 2000s, the FBI's Carnivore system drew considerable attention and…

June 27, 2024

DARPA Announces Newest X-plane: XRQ-73

The Defense Advanced Research Projects Agency (DARPA) has unveiled its latest X-plane, the XRQ-73, under…

June 25, 2024

FBI Files: Historical Figures & Groups

Background Welcome to the FBI Files on Historical Figures & Groups archive at The Black…

June 25, 2024

Declassified NRC Document Sheds Light on Kyshtym Nuclear Explosion

The release of a Freedom of Information Act (FOIA) document by the U.S. Nuclear Regulatory…

June 24, 2024